by Stuart Fricke | Nov 6, 2017
Kennewick, WA for Home Street Bank WSI performed a Phase I ESA for the property formerly operated as LaPointe’s Auto Company. We evaluated the likelihood of recognized environmental conditions being present at the site. The scope of work was in accordance with...
by Stuart Fricke | Oct 23, 2017
In this project, the Naches River seriously threatened the home of Mark and Lilly Moore due to continued bank erosion. White Shield provided a sufficient evaluation, design, report, drawing, and preparation of the regulatory forms to mitigate continued bank erosion,...
by Stuart Fricke | Aug 7, 2017
Dungeness River Match, Sequim WA; Washington State Department of Fish and Wildlife White Shield recently assisted Fish & Wildlife by conducting a Phase I Environmental Site Assessment on Olympic Game Farm. An on-site reconnaissance of the property was performed to...
by Stuart Fricke | Aug 7, 2017
U.S. Navy Other Environmental Liability (OEL), Various Naval Bases, WA; URS for the Department of the Navy White Shield, working as subcontractor for URS Corporation, assisted in conducting “Other Environmental Liability” (OEL) inventories at several Puget Sound Naval...
by Stuart Fricke | Aug 7, 2017
Hazardous Materials Inventory & Categorization, Great Plains Region; Bureau of Indian Affairs White Shield provided inspection and project management support for the identification of unknown hazardous materials located at 28 Bureau of Indian Affairs road shop...
by Stuart Fricke | Aug 7, 2017
Central Link Light Rail Alignment Phase I and II Environmental Site Investigations, Seattle, WA; Garry Struthers & Associates for Sound Transit White Shield provided support for Alignment Screening, Phase I Environmental Site Assessments (ESAs), and Phase II ESA...
by Stuart Fricke | Aug 7, 2017
Hazardous Materials Assessment (Asbestos, Lead-based Paint & Hazardous Materials), Washington StatePenitentiary, Walla Walla, WA; DLR Group Architects for Washington State Department of Corrections White Shield performed a hazardous materials assessment for nine...
by Stuart Fricke | Aug 7, 2017
Phase I Environmental Site Assessment, Lincoln City, OR; Confederate Tribes of Siletz Tribe of Oregon A Phase I Environmental Site Assessment was completed in compliance with ASTM Standards E1527 and E1528 on a 38-acre undeveloped parcel. Tasks included site...
by Stuart Fricke | Aug 7, 2017
Lead-based Paint Inspection and Risk Assessments, Various Naval Bases, WA; URS for the Department of Navy White Shield provided lead-based paint inspection and risk assessment services at naval housing facilities located on various naval facilities throughout the...
by Stuart Fricke | Aug 7, 2017
Phase I Environmental Site Assessments, Tulalip Indian Reservation, Marysville, WA; Tulalip Tribal Housing Authority In support of the application for a Raymond James Tax Credit, White Shield, Inc. (WSI) has conducted six Phase I Environmental Site Assessments (ESAs)...
by Stuart Fricke | Aug 7, 2017
Phase II Environmental Site Assessment Oversight, Investco/Looney Site, Tacoma, WA; Environmental Management Services, LLC White Shield provided oversight and report review for a Phase II Environmental Site Assessment at a former steam plant located along the Thea...
by Stuart Fricke | Aug 7, 2017
Upper Columbia River Field Investigation and Sampling; CH2M Hill for the Environmental Protection Agency, Region 10 White Shield provided CH2M-Hill with a Sample Processing Coordinator for the Upper Columbia River Sampling Project in order to coordinate sediment...
by Stuart Fricke | Aug 7, 2017
Phase II Environmental Subsurface Investigations, Consolidated Freightways, Kennewick, WA; Blymyers Engineers White Shield provided various environmental services at the Consolidated Freightways facility including UST decommissioning and assessment, environmental...
by Stuart Fricke | Aug 7, 2017
Groundwater Monitoring and Sampling, Boomsnub Site, Vancouver, WA; URS Corporation for the U.S. Environmental Protection Agency, Region 10 White Shield performed technical assistance services for URS Corporation on the Remedial Action Contract (RAC) for EPA Region 10...
by Stuart Fricke | Aug 7, 2017
Phase I Environmental Site Assessment, Severson/Selinco Properties; Sequim, WA; Washington State Department of Fish and Wildlife Washington State Department of Fish and Wildlife, on behalf of the Trust for the Public Lands, retained White Shield to conduct a Phase I...
by Stuart Fricke | Aug 7, 2017
Lead Paint Stabilization for Historic Buildings, Trout Lake, WA; USDA Forest Service Region 6 This project entailed historic restoration, lead remediation and stabilization on 2 large Historic Buildings. This work was performed on Buildings 2100 and 2200. White Shield...
by Stuart Fricke | Aug 7, 2017
Remedial Investigation for Gasoline Leak, Smitty’s Conoco, Kennewick, WA; R.H. Smith Distributing White Shield provided a Hydrogeologist and Project Manager for the investigation and remediation of a 6500- gallon gasoline leak at a service station in Kennewick,...
by Stuart Fricke | Aug 7, 2017
Paradise Inn UST De-commissioning, Mt. Rainier National Park, Paradise, WA; Watts Construction for the National Park Service During a planned re-design and construction of the Paradise Inn, the main lodge in Mt. Rainier National Park at Paradise, Washington, it was...
by Stuart Fricke | Aug 7, 2017
Genesee Union Hardware Store Fueling Station, Genesee, ID; Central Environmental Construction for Pacific Northwest Farmer Cooperative White Shield (WSI) provided site assessment and remediation oversight services at the Genesee Warehouse(now Pacific Northwest Farmer...
by Stuart Fricke | Aug 7, 2017
Phase II Environmental Assessment and Tank Removal, Vashon, WA; K2 Corporation White Shield (WSI) provided K2 Corporation with a Phase II Environmental Site Assessment at their facility located on Vashon Island. WSI installed eleven borings at selected locations...